Service instruction |
Date of issue |
Reason |
Files |
---|---|---|---|
SI 2024/03
|
25.9.2024 | Loose passenger handle line |
pdf
|
SI 2024/02
|
2.8.2024 | Replacing of FDS Tri-Lite vent panel |
pdf
|
SI 2024/01
|
29.4.2024 | Replacing of control line carabiners without operating line jack |
pdf
|
SI 2023/04 rev. 1
|
6.3.2024 | Basket stainless steel cables replacement |
pdf
|
SI 2023/03
|
21.9.2023 | Replacement of control line of parachute/paralite DS |
pdf
|
SI 2023/01
|
27.3.2023 | Installation of Transponder Equipment |
pdf
|
SI 2022/06 rev. 1
|
29.5.2023 | Allowed carabiner types |
pdf
|
SI 2022/04
|
28.4.2023 | Tightening the cardan bolts. |
pdf
|
SI 2021/01
|
21.6.2021 | Installation of side skids |
pdf
|
SI 2020/04
|
14.10.2020 | Gimbal block assemnly after transport |
pdf
|
SI 2020/03
|
29.5.2020 | Guidance on Balloon Cleaning and Disinfection |
pdf
|
SI 2020/02 rev.1
|
5.5.2020 | Installation and using of transparent dividers |
pdf
|
SI 2019/2 rev. 3
|
6.2.2020 | Combination with Kavanagh (or Kavanagh-Cameron) Bottom ends |
pdf
|
SI 2019/1 rev. 1
|
31.1.2019 | Pilot Restraint Harness Fixing Point Installation |
pdf
|
SI 2018/3
|
6.11.2018 | Ball Valve Lever Nut Securing for Kubicek Fuel Cylinders |
pdf
|
SI 2018/2
|
12.10.2018 | Gyro Locking Pin Replacement |
pdf
|
SI 2018/1 rev. 1
|
27.8.2018 | Center Jet Installation for Kubicek Ignis Burners |
pdf
|
SI 2017/1
|
12.9.2017 | Increasing of Slide Vent Deflation System Efficiency |
pdf
|
SI 2015/2
|
30.7.2015 | Combination with Kavanagh Bottom Ends |
pdf
|
SI 2014/1
|
14.7.2014 | Installation of H-shaped Floor Runners |
pdf
|
SI 2013/1
|
11.10.2013 | Increasing of Efficiency of Paralite Deflation System |
pdf
|
SI 2012/4 rev. 1
|
4.10.2013 | Reduction of Condensate Water at Ignis Burner |
pdf
|
SI 2012/3 rev. 1
|
4.10.2013 | Basket Karabiner Stopper |
pdf
|
SI 2012/2 rev.1
|
4.10.2013 | Replacement of Pressure Reducer Piston in Ignis Burners |
pdf
|
SI 2012/1 rev.1
|
4.10.2013 | Check of Seals in Rego Connectors |
pdf
|